A commission via Worcester County Council who were constructing an avant-garde suspension pedestrian-bridge overn the busy A54.
Christopher was asked to veryify the physical mechanics and the calculated sizes. At the time it was cutting-edge technology and pushed both Christopher and his computer skills to the limits. The outcome was a set of 3D modelled components that aligned perfectly in the virtual world thus providing the fabricators with the confidence to manuafacture from the data Christopher provided.